Unplanned outages of generating units (partial and total)

Within a delay of 30 minutes after an total or partial unplanned unavailability of a generating unit over 100 MW occurs, the responsible generator sends information to RTE which displays it on this webpage.

A unit is declared unavailable in case of:

  • Unplanned outage of a unit over 100 MW

A unit is declared partially unavailable in case of:

  • Unplanned reduction of more than 100 MW of available power of the unit

The information displayed contains the name, the technology and the installed capacity of the generating unit, the date and time of the outage start and if applicable the available capacity.

Information can be completed with the reason of the unavailability and its estimated end date until the morning of the day following the outage.

After this deadline, the case is closed (under the « Closed » tab) and the availability of the generating unit should be followed up through the publication of detailed availability forecasts of generating units.

Should the generator have sent an incorrect information, the data can, on its request, be moved under the « Cancelled » tab.

 

List of ongoing unplanned outages of generating units
Date and time
of the first message
regarding the outage
Date and time
of the last update
Name of the generating unit concerned Installed capacity of the generating unit Available capacity Details
16/09/2014 17:05 16/09/2014 21:59 EMILE HUCHET 6 600 MW 0 MW Details
Archives
Years Files
2014 File.zip zip
2013 File.zip zip
2012 File.zip zip
2011 File.zip zip
2010 File.zip zip

Legal disclaimer

By accessing this website, each user accepts the present disclaimer.

All production data published on this website are for energy-market players only. Such players undertake to take appropriate steps to verify the quality of the published data. As a consequence, each user acknowledges that he/she uses such published data and information at its own risks.

The freely published production data are for information purposes only and are not legally binding. The producers participating to these publications and RTE make their best efforts to provide the information they have at their disposal on the publication dates, except in case of force majeure. In particular, the provisional information constitute the producers’ best estimate at the time of the publication and are not legally binding ; they may vary, notably on the basis of analysis that may be carried out on technical and surety aspects. The producers give no warranty whatsoever as to the updating of the estimates due to new information.

RTE and the electricity producers disclaim all liability in case of total or partial interruption of the publications and disclaim all liability for loss or damage which may result from the use by third parties of the data and/or information so published, including any mistakes, inaccuracies, or omissions in the data and/or information to the fullest extent permitted by law.

RTE and the producers shall not be liable for any damage resulting from the use of the data and/or information, except in case of wilful misconduct (« faute intentionnelle avérée ») and provided the user demonstrates a direct link between the wilful misconduct and the damage or the loss he/she suffers.