Optional Services Contract

You hold a Generator Network Access Contract (CART)


If you signed a Generator Network Access Contract (CART), RTE can provide you with the following optional services:

  • Calculation services subscribed as a Lead Generator
  • Tariff Simulation Service
  • Metering Transducers Service
  • Complementary service in the event of unplanned unavailability of the underwater part of the evacuation network of an offshore production facility

Access the template for the optional Service Contract:


  Download View online (1)
  • Optional Service Contract for customers with a Consumer CART (in French only)
.zip (1.45 Mo) zip .pdf (1.53 Mo) pdf
  • Direct debit mandates
.zip (551 Ko) zip  

Updated: 15/11/2019


You didn’t signed a Generator Network Access Contract (CART)


You have not signed a Generator Network Access Contract, RTE can provide you with the following Optional services:

  • Calculation services subscribed by a Hosted Generator Site
  • Tariff Simulation Service
  • Metering Transducers Service

Access the template for the optional Service Contract:


  Download View online (1)
  • Optional Service Contract for customers without a CART (in French only)
.zip (500 Ko) zip .pdf (538 Ko) pdf
  • Direct debit mandates
.zip (551 Ko) zip  

Updated: 15/11/2019

Find all of our services in Cataliz, our catalog on line.

Your sales contact will be pleased to advise you on how to sign up for these services.

 

(1) Acrobat Reader is required if you wish to consult the documents.
You can download this reading tool at the following address :

Télécharger Acrobat Reader