France - Spain
Interconnection capacities between France and Spain are allocated at the yearly, monthly daily and intra-daily timeframes, in both directions. Capacities are allocated through explicit auctions jointly coordinated by the two Transmission System Operators, the Spanish Red Electrica de Espana (REE) and RTE.
The allocation mechanism is described in the Capacity Allocation Rules for the France-Spain Interconnection (IFE Rules), elaborated by the two TSOs.
The capacities to be sold at each timeframe are calculated by REE and RTE, taking into account transmission system safety rules.
| Download | On-Line Consultation (1) |
|
|---|---|---|
| "IFE Rules v3.0 (1st June 2009) | .zip (240 ko) |
.pdf (383 ko) |
| IFE Rules v2.0 | .zip (240 Ko) |
.pdf (383 Ko) |
| Indicative Auction Timetable for 2012 updated on 01/12/2011 |
.zip (41 ko) |
.pdf (47 ko) |
| Capacities, specifications and auctions results | ||
| Generic Monthly Auctions Specifications | .zip (106 Ko) |
.pdf (108 Ko) |
| Intra-daily auction specifications | ||
| List of participants | ||
| Time series | ||


