France - Spain
Last updates:
November 22nd, 2012: Structure of the allocation of Capacity among different Timeframes:
The Structure of the Allocation of Capacity among different Timeframes (also called Split Rules) on the French-English, French-Belgian, French-German, French-Italian and French-Spanish borders have been approved by CRE in its deliberation of November 13th 2012 (which can be found on CRE website).
Please find below The Structure of the Allocation of Capacity among different Timeframes for 2013 on France-Spain border which has been approved by CRE.
| Download | On-Line Consultation (1) | |
|---|---|---|
|
.zip (66 ko) |
.pdf (73 Ko) |
Documents updated on: 10/01/2012
Interconnection capacities between France and Spain are allocated at the yearly, monthly daily and intra-daily timeframes, in both directions. Capacities are allocated through explicit auctions jointly coordinated by the two Transmission System Operators, the Spanish Red Electrica de Espana (REE) and RTE.
The allocation mechanism is described in the Capacity Allocation Rules for the France-Spain Interconnection (IFE Rules), elaborated by the two TSOs.
The capacities to be sold at each timeframe are calculated by REE and RTE, taking into account transmission system safety rules.
| Download | On-Line Consultation (1) |
|
|---|---|---|
| Indicative Auction Timetable for 2013 updated on 15/11/2012 |
.zip (37 ko) |
.pdf (43 ko) |
| Indicative Auction Timetable for 2012 updated on 01/12/2011 |
.zip (41 Ko) |
.pdf (47 Ko) |
| "IFE Rules v3.0 (1st June 2009) | .zip (240 ko) |
.pdf (383 ko) |
| IFE Rules v2.0 | .zip (240 Ko) |
.pdf (383 Ko) |
| Capacities, specifications and auctions results | ||
| Generic Monthly Auctions Specifications | .zip (106 Ko) |
.pdf (108 Ko) |
| Intra-daily auction specifications | ||
| List of participants | ||
| Time series | ||


