Annual forecast NTC during the planned maintenance

Annual forecast NTC during the planned maintenance Archives

Interconnection between France and England


Forecast data
Year of works Date of update
2013 17/05/2013
Net Transfer Capacity (NTC in MW)
Date of start of works Date of end of works Export Import Type
01/01/2013 02/01/2013 1500 1500 P
03/01/2013 10/02/2013 1000 1000 DR
11/02/2013 28/02/2013 1500 1500 DR
01/03/2013 12/03/2013 1500 1500 P
13/03/2013 15/03/2013 1000 1000 P
16/03/2013 21/03/2013 500 500 DR
22/03/2013 22/03/2013 1000 1000 P
23/03/2013 24/03/2013 1500 1500 P
25/03/2013 29/03/2013 1000 1000 P
30/03/2013 17/04/2013 1500 1500 DR
17/04/2013 17/04/2013 1000 1000 P
18/04/2013 02/06/2013 1500 1500 P
03/06/2013 21/06/2013 1000 1000 P
16/09/2013 21/09/2013 1500 1500 P
19/10/2013 25/10/2013 1000 1000 P
Download the data

P = Planned works    DR = Damage repairs

In a transitory way, the capacity over these periods could be lower than the values announced according to the technical requirements of management of the connection