Data archives before 01/01/2006

Daily allocation mechanism : Proposed Net Capacity on D-2

France-Belgium Interconnection

 

Proposed Net Capacity (seen from d-2 in MW) for the day of : 31/12/2005


Likelihood of congestion (in MW)
00h
01h
01h
02h
02h
03h
03h
04h
04h
05h
05h
06h
06h
07h
07h
08h
08h
09h
09h
10h
10h
11h
11h
12h
12h
13h
13h
14h
14h
15h
15h
16h
16h
17h
17h
18h
18h
19h
19h
20h
20h
21h
21h
22h
22h
23h
23h
24h
3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400 3400
blanc Low marron strié Medium marron Hight * Unavailable values
Base scenario D-2 for the day 31/12/2005
Border Peak Time Hypothesis Off-peak Time Hypothesis
Germany -500 -500
England 2000 2000
Belgium 2200 2200
Spain 300 300
Italy 2650 2540
Switzerland 3000 3000
Download the data in the Excel 7.0 format
Year Download
2005 File.zip zip
2004 File.zip zip
2003 File.zip zip
2002 File.zip zip

RTE shall not be held liable for the use that may be made of the forecast data provided.