Unplanned outages of generating units (partial and total)

Within a delay of 30 minutes after an total or partial unplanned unavailability of a generating unit over 100 MW occurs, the responsible generator sends information to RTE which displays it on this webpage.

A unit is declared unavailable in case of:

  • Unplanned outage of a unit over 100 MW

A unit is declared partially unavailable in case of:

  • Unplanned reduction of more than 100 MW of available power of the unit

The information displayed contains the name, the technology and the installed capacity of the generating unit, the date and time of the outage start and if applicable the available capacity.

Information can be completed with the reason of the unavailability and its estimated end date until the morning of the day following the outage.

After this deadline, the case is closed (under the « Closed » tab) and the availability of the generating unit should be followed up through the publication of detailed availability forecasts of generating units.

Should the generator have sent an incorrect information, the data can, on its request, be moved under the « Cancelled » tab.

 

List of closed unplanned outages of generating units
Date and time
of the first message
regarding the outage
Date and time
of the last update
Name of the generating unit concerned Installed capacity of the generating unit Available capacity Details
19/06/2013 08:05 19/06/2013 08:16 PORCHEVILLE B 3 585 MW 0 MW Details
18/06/2013 17:45 18/06/2013 17:45 PORCHEVILLE B 3 585 MW 450 MW Details
18/06/2013 15:30 19/06/2013 10:00 VAIRES 2 187 MW 0 MW Details
18/06/2013 14:19 18/06/2013 15:38 PORCHEVILLE B 3 585 MW 187 MW Details
17/06/2013 18:48 18/06/2013 09:45 MONTEREAU 6 176 MW 0 MW Details
17/06/2013 15:19 18/06/2013 03:07 CATTENOM 2 1300 MW 775 MW Details
17/06/2013 13:23 17/06/2013 13:35 VITRY (-SUR-SEINE) 4 250 MW 0 MW Details
17/06/2013 10:11 18/06/2013 09:05 MONTEZIC 2 227.5 MW 0 MW Details
17/06/2013 10:08 17/06/2013 10:08 MONTEZIC 1 227.5 MW 0 MW Details
17/06/2013 09:44 17/06/2013 10:31 CHINON B 2 905 MW 770 MW Details
17/06/2013 07:45 17/06/2013 08:56 NOGENT-SUR-SEINE 1 1310 MW 580 MW Details
17/06/2013 06:38 17/06/2013 06:38 GRAND-MAISON 11 157.1 MW 0 MW Details
16/06/2013 15:42 16/06/2013 22:55 FLAMANVILLE 2 1330 MW 0 MW Details
16/06/2013 06:08 17/06/2013 09:07 GRAND-MAISON 7 152.5 MW 0 MW Details
16/06/2013 01:12 16/06/2013 02:28 SISTERON 2 126.5 MW 0 MW Details
15/06/2013 02:57 15/06/2013 08:52 SUPER-BISSORTE 2 152.5 MW 0 MW Details
12/06/2013 20:44 13/06/2013 05:40 FLAMANVILLE 2 1330 MW 1190 MW Details
12/06/2013 18:58 14/06/2013 08:34 CORDEMAIS 4 580 MW 0 MW Details
11/06/2013 22:48 12/06/2013 08:45 SUPER-BISSORTE 3 152.5 MW 0 MW Details
11/06/2013 22:48 12/06/2013 08:44 SUPER-BISSORTE 5 162.3 MW 0 MW Details
11/06/2013 22:48 12/06/2013 08:44 SUPER-BISSORTE 2 152.5 MW 0 MW Details
11/06/2013 22:45 12/06/2013 08:45 SUPER-BISSORTE 1 152.5 MW 0 MW Details
11/06/2013 18:09 11/06/2013 18:09 FLAMANVILLE 2 1330 MW 1190 MW Details
11/06/2013 11:18 12/06/2013 09:43 MONTEREAU 5 176 MW 0 MW Details
11/06/2013 08:35 15/06/2013 10:21 FLAMANVILLE 2 1330 MW 0 MW Details
11/06/2013 08:24 11/06/2013 09:01 MARTIGUES-PONTEAU 6 460 MW 25 MW Details
11/06/2013 02:16 12/06/2013 09:43 CATTENOM 1 1300 MW 0 MW Details
10/06/2013 16:24 11/06/2013 09:15 MONTEREAU 5 176 MW 0 MW Details
10/06/2013 15:20 10/06/2013 15:20 BLENOD 3 250 MW 0 MW Details
10/06/2013 10:45 10/06/2013 12:57 FLAMANVILLE 2 1330 MW 1174 MW Details
10/06/2013 08:41 11/06/2013 08:48 SUPER-BISSORTE 5 162.3 MW 0 MW Details
10/06/2013 07:11 10/06/2013 08:44 ST-ALBAN-ST-MAURICE 1 1335 MW 0 MW Details
10/06/2013 06:55 10/06/2013 13:03 DAMPIERRE-EN-BURLY 2 890 MW 380 MW Details
09/06/2013 21:16 10/06/2013 09:02 BLAYAIS (LE) 2 910 MW 815 MW Details
09/06/2013 19:13 10/06/2013 08:53 COMBE D AVRIEUX 1 123 MW 0 MW Details
09/06/2013 13:02 09/06/2013 20:48 DAMPIERRE-EN-BURLY 2 890 MW 0 MW Details
09/06/2013 11:31 09/06/2013 12:36 CRUAS 2 915 MW 760 MW Details
09/06/2013 07:19 09/06/2013 10:07 GRAVELINES 3 910 MW 600 MW Details
08/06/2013 16:53 09/06/2013 10:07 DAMPIERRE-EN-BURLY 2 890 MW 0 MW Details
08/06/2013 16:10 09/06/2013 10:08 TRICASTIN (LE) 2 915 MW 55 MW Details
08/06/2013 10:41 09/06/2013 08:58 SUPER-BISSORTE 5 162.3 MW 0 MW Details
08/06/2013 05:02 09/06/2013 08:57 REVIN 3 202 MW 0 MW Details
08/06/2013 04:28 08/06/2013 08:39 CHEYLAS (LE) 1 259 MW 0 MW Details
08/06/2013 04:17 08/06/2013 08:39 CHEYLAS (LE) 2 259 MW 0 MW Details
07/06/2013 13:56 08/06/2013 09:25 CATTENOM 1 1300 MW 0 MW Details
07/06/2013 07:20 08/06/2013 09:25 PALUEL 3 1330 MW 1130 MW Details
06/06/2013 19:56 06/06/2013 19:56 EMILE HUCHET 6 600 MW 0 MW Details
06/06/2013 16:58 07/06/2013 08:55 SUPER-BISSORTE 3 152.5 MW 0 MW Details
06/06/2013 16:58 06/06/2013 16:58 EMILE HUCHET 6 600 MW 450 MW Details
06/06/2013 16:55 07/06/2013 08:56 SUPER-BISSORTE 2 152.5 MW 0 MW Details
06/06/2013 16:54 07/06/2013 08:55 SUPER-BISSORTE 1 152.5 MW 0 MW Details
06/06/2013 14:17 06/06/2013 14:42 DK6 2 400 MW 167 MW Details
05/06/2013 22:15 06/06/2013 08:55 CHEYLAS (LE) 2 259 MW 0 MW Details
05/06/2013 19:00 05/06/2013 19:00 EMILE HUCHET 6 600 MW 0 MW Details
05/06/2013 18:07 06/06/2013 08:55 CHEYLAS (LE) 1 259 MW 0 MW Details
05/06/2013 14:50 08/06/2013 09:25 BOUCHAIN 1 250 MW 0 MW Details
04/06/2013 22:14 05/06/2013 08:34 SUPER-BISSORTE 2 152.5 MW 0 MW Details
04/06/2013 18:36 04/06/2013 18:36 EMILE HUCHET 6 600 MW 0 MW Details
03/06/2013 20:11 04/06/2013 08:25 SUPER-BISSORTE 1 152.5 MW 0 MW Details
03/06/2013 01:44 03/06/2013 03:33 TRICASTIN (LE) 3 915 MW 500 MW Details
02/06/2013 13:07 02/06/2013 13:07 TRICASTIN (LE) 3 915 MW 525 MW Details
02/06/2013 10:43 03/06/2013 08:54 REVIN 1 202 MW 0 MW Details
02/06/2013 07:28 02/06/2013 07:28 GRAVELINES 6 910 MW 274 MW Details
01/06/2013 22:50 02/06/2013 09:53 TRICASTIN (LE) 3 915 MW 525 MW Details
01/06/2013 21:26 02/06/2013 09:47 HAVRE (LE) 2 585 MW 290 MW Details
01/06/2013 13:01 02/06/2013 09:50 TRICASTIN (LE) 2 915 MW 0 MW Details
01/06/2013 10:25 02/06/2013 12:36 PALUEL 3 1330 MW 800 MW Details
Archives
Years Files
2013 File.zip zip
2012 File.zip zip
2011 File.zip zip
2010 File.zip zip

Legal disclaimer

By accessing this website, each user accepts the present disclaimer.

All production data published on this website are for energy-market players only. Such players undertake to take appropriate steps to verify the quality of the published data. As a consequence, each user acknowledges that he/she uses such published data and information at its own risks.

The freely published production data are for information purposes only and are not legally binding. The producers participating to these publications and RTE make their best efforts to provide the information they have at their disposal on the publication dates, except in case of force majeure. In particular, the provisional information constitute the producers’ best estimate at the time of the publication and are not legally binding ; they may vary, notably on the basis of analysis that may be carried out on technical and surety aspects. The producers give no warranty whatsoever as to the updating of the estimates due to new information.

RTE and the electricity producers disclaim all liability in case of total or partial interruption of the publications and disclaim all liability for loss or damage which may result from the use by third parties of the data and/or information so published, including any mistakes, inaccuracies, or omissions in the data and/or information to the fullest extent permitted by law.

RTE and the producers shall not be liable for any damage resulting from the use of the data and/or information, except in case of wilful misconduct (« faute intentionnelle avérée ») and provided the user demonstrates a direct link between the wilful misconduct and the damage or the loss he/she suffers.