Annual forecast NTC during maintenance before 2015


Interconnection between France and l'Italie




Net Transfer Capacity (NTC in MW)
Date of start of works Date of end of works Export Import Type
30/06/2014 13/07/2014 990 * P
14/07/2014 20/07/2014 2090 * P
28/07/2014 29/07/2014 1090 * P
18/08/2014 22/08/2014 1090 * P

P = Planned works   DR = Damage repairs 

 

Download the data 2015 in the Excel 7.0 format
Data Download
2015 schedule updated on 17/11/2014 file.zip zip
Interconnection schedule for 2015 file.zip zip
Schedule of all the interconnections for 2015 file.zip zip