Additional information regarding generation

Information published on this webpage is provided in addition to information routinely released for transparency purposes, regarding forecasted availability and unplanned outages in particular.

This new publication aims at enabling all markets participants to assess the overall supply situation from the generators involved in the Union Française de l'Electricité (UFE) transparency initiative.

02/07/2020 19:37 n°5295 - EDF displayed:

 

Compte tenu des conditions de reprise des activités sur les sites, EDF ajuste la durée des arrêts de ses installations programmés en 2020 et revoit à la hausse son estimation de production nucléaire pour 2020 à environ 315-325 TWh (voir le communiqué de presse d’EDF du 2 juillet 2020).

------------------------------------------------------------------------------------

Taking into account the conditions observed on sites for resuming activities, EDF adjusts the duration of planned outages for 2020 and revises upwards its nuclear output estimate in France for 2020 to around 315-325 TWh (see EDF press release as of 2nd july).

 

 

 

 

01/07/2020 11:56 n°5294 - EDF displayed:

[ANNULE ET REMPLACE LE MESSAGE 5290]   Fin de la gestion particulière des semaines d'arrêt pour modulation jusqu'à son prochain arrêt pour maintenance ------------- [CANCELS AND REPLACES MESSAGE 5290]  
  End of the specific management of modulation weeks for the Saint-Laurent 2 power unit until its next stop for maintenance.

01/07/2020 11:52 n°5293 - EDF displayed:

[ANNULE ET REMPLACE LE MESSAGE 5288] La tranche de Dampierre 1 doit être arrêtée 23 semaines pour modulation d’ici son prochain arrêt pour maintenance, qui est programmé en semaine 25 de l’année 2021. Le placement prévisionnel de ces semaines d’arrêt pour modulation est publié dans la section indisponibilités prévisionnelles du site, il sera réinterrogé et la tranche sera redémarrée si les conditions économiques le justifient.------------- [CANCELS AND REPLACES MESSAGE 5288]The Dampierre 1 power unit will have to be stopped at least for 23 weeks for modulation by its next maintenance planned in week 25 in year 2021. The positioning of these modulation weeks is provisional: it will be reassessed and the plant will be restarted if economically justified.

Legal disclaimer

By accessing this website, each user accepts the present disclaimer.

All production data published on this website are for energy-market players only. Such players undertake to take appropriate steps to verify the quality of the published data. As a consequence, each user acknowledges that he/she uses such published data and information at its own risks.

The freely published production data are for information purposes only and are not legally binding. The producers participating to these publications and RTE make their best efforts to provide the information they have at their disposal on the publication dates, except in case of force majeure. In particular, the provisional information constitute the producers’ best estimate at the time of the publication and are not legally binding ; they may vary, notably on the basis of analysis that may be carried out on technical and surety aspects. The producers give no warranty whatsoever as to the updating of the estimates due to new information.

RTE and the electricity producers disclaim all liability in case of total or partial interruption of the publications and disclaim all liability for loss or damage which may result from the use by third parties of the data and/or information so published, including any mistakes, inaccuracies, or omissions in the data and/or information to the fullest extent permitted by law.

RTE and the producers shall not be liable for any damage resulting from the use of the data and/or information, except in case of wilful misconduct (« faute intentionnelle avérée ») and provided the user demonstrates a direct link between the wilful misconduct and the damage or the loss he/she suffers.